财政部关于印发《国际金融组织贷款项目提款报账管理办法》的通知

  我们在此证明上述金额已用于支付项目执行活动,且符合贷款协定的条款和条件。
  上述支出的所有凭证保存在__________并随时可以接受检查团审核。
  1.对每个类别和不同的采购国家,应分别制作汇总表。
  2.确认总金额或所有汇总表金额之和等于或大于10万美元,且等于申请的总金额。
  3.对每个项目应指明付款是一次性付款,还是分期付款。如是分期付款,说明分期付款的次数。
  4.适用于(周转金账户的)清算/补充,应附上银行对账单和调节表。本栏输入数据应为银行对账单上金额。

  附件十一:
  亚洲开发银行汇总表(Summary Sheet)
  (适用于承诺函方式)

  亚行贷款号ADB Loan No.:
  申请书号Applicationa No.:
  信用证号1L/C No.:
  日期Date:
┌────────────────────┬─────────────────────┐
│受益人(供货商)名称和地址        │信用证金额和币种             │
│Name and Address of Beneficary (Suppli-│L/C Amount and Currency:        │
│er):                  │                     │
│                    │等值美元/特别提款权的金额        │
├────────────────────┤                     │
│                    │US$/SDR Equivalent:           │
│开证人名称(借款人或项目执行机构)    │信用证到期日               │
│Name of L/C Accountee(Borrower of   │LC/Expiry date:             │
│EA):                  │信用证装运日               │
│                    │L/C Shipping Date:           │
├────────────────────┼─────────────────────┤
│开证行名称和地址            │支付条款                 │
│                    │                     │
│Name and Address of Issuing Bank:   │Terms of Payment:            │
│                    │                     │
├────────────────────┼─────────────────────┤
│通知行名称和地址(如果有的话)      │货物及服务简单描述            │
│                    │                     │
│Name and Address of Advising Bank (if  │Brief Description of Goods and Services: │
│Applicable):              │                     │
│                    │                     │
│银行代码                │                     │
│Bank Code:               │                     │
├────────────────────┼─────────────────────┤
│议付行或付款行名称和地址(接受承     │执行单位合同号/订单号和签约日期     │
│诺函的银行)               │EA Contract No./PO Reference No.and │
│Name and Address of Paying Bank of Ne- │Date:                  │
│gotiating Bank(Bank to Which Commit-  │                     │
│ment Letter is to be Issued):     │亚行合同号(PCSS号):           │
│银行代码                │贷款类别号                │
│Bank Code:               │Category Refrence No.:         │
└────────────────────┴─────────────────────┘
┌────────────────┬─────────────┐
│备注              │仅需开发性金融机构转贷填写│
│Remarks:            │For DFI Loans only:   │
│                │             │
│                │采购国家         │
│                │County of Procurement:  │
│                │转贷款号         │
│                │Subloan No.:      │
└────────────────┴─────────────┘

  1需附两份签过字的信用证。Two copies of signed L/C should be attached.

  附件十二:

        自营工程的证明文件(第Ⅰ部分和第Ⅱ部分)
--------------------------------------------------------------------------------
       自营工程证明(第Ⅰ部分) CERTICATE (PART I)
           FOR FORCE ACCOUNT WORKS

                         日期Date:
兹证明截止    (日期)与      有关的工程累计进度为      %
It is certified that as of (date) the cumulative progress on the work relating
to  was  %.

                       签字1: 
                       姓名:
                       职务或职称:

1.须是项目顾问或总工程师,或项目执行机构的授权代表。
--------------------------------------------------------------------------------


            自营工程证明(第Ⅱ部分) CERTIFICATE (PARTⅡ)
                 FOR FORCE ACCOUNT WORKS


  亚行对此自营工程的融资额为    美元。  根据上述证明(Ⅰ)所列的工程完工进度,累计应提款额为    美元 。根据到  号为止的提款申请书的提款申请,已提用    美元。现根据  号提款申请书,要求提取  美元的余额。
  The amount of ADB loan allocated for financing this force account works is US$      .On the basis of the percentage of work completed as certified in part I above,the cumulative amount that could be withdrawn is US$    .An amount of US$  has already been withdrawn under withdrawal applications up to and including application No.  and the balance of US$  is now requested to bewithdrawn under application No.       .


  该自营工程的融资额为
  Amount calculated for financing this force account works            美元US $
  累计可提款金额为
  Cumulative amount that could be withdrawn                   美元US $
  (上述证明(Ⅰ)所列的工程完工百分比)
  (Percentage of work completed in Part I above)
  减去 :至(最近一次申请支付额)提款申请为止的已提款金额
  Less:Amount already withdrawn up to withdrawal application
  (latest application paid)                           美元US $
  现要求的提款金额
  Amount now requested for withdrawal                       美元US $
  (本次申请)
  (This Application) 
                                          提款签字人
                                          (单位公章)

  附件十三:
  亚洲开发银行项目实际完工进度表
  PHYSICAL PROGRESS BY PROJECT ACTIVITIES
  截止  年  月的季度报表For the Quarter Ending______,20________
  (以百万美元为单位In Million $)

┌────────────────┬─────────────────────────────────────────────────────────────┐
│贷款号Loan No.:        │项目名称Project Name:                                                  │
├────┬───────────┼────────────────────────────────────────┬──────┬────────┬────┤
│明细  │ 成本概算1      │               实施进度表                     │时间跨度  │ 完工百分   │备注  │
│Particu-│(以百万为单位)    │            Implementation Schedule                 │(第5栏 比  │  比%    │Remarks │
│ lars │  Cost Estimate   │                                        │第6栏)   │Percentage   │    │
│    │ (In Million $)   │                                        │Time Elapsed│  (%)    │    │
│    │           │                                        │(Col.5 /6)│Accomplishments │    │
│    ├───┬───┬───┼───────┬────┬──────┬──────┬───────┬─────┤      │        │    │
│    │国外 │本国 │ 小计 │评估时预计  │开工日期│延期月份  │预计完工日期│评估时预计完 │延期月份 │      │        │    │
│    │   │   │   │       │    │      │      │       │     │      ├────┬───┤    │
│    │For- │Local │Total │开工日期   │Date  │(第5栏减  │Appraisal  │工日期    │(第8栏减 │      │计划  │实际 │    │
│    │   │   │   │       │    │      │      │       │     │      │Progress│Actual│    │
│    │eign │   │   │Appl.Sched  │Started │第4栏)   │Sched for  │Target Date of│第7栏)  │      │    │   │    │
│    │   │   │   │for Start-up │    │Delay in  │Completion │Completion  │Delay in │      │    │   │    │
│    │   │   │   │       │    │Months   │      │       │Months  │      │    │   │    │
│    │   │   │   │       │    │(Col.5- 4) │      │       │(Col. 8-7)│      │    │   │    │
├────┼───┼───┼───┼───────┼────┼──────┼──────┼───────┼─────┼──────┼────┼───┼────┤
│    │ 1  │  2 │  3 │  4     │  5  │  6    │  7    │  8     │  9   │  10   │ 11  │ 12 │  13 │
├────┼───┼───┼───┼───────┼────┼──────┼──────┼───────┼─────┼──────┼────┼───┼────┤
│    │   │   │   │       │    │      │      │       │     │      │    │   │    │
└────┴───┴───┴───┴───────┴────┴──────┴──────┴───────┴─────┴──────┴────┴───┴────┘
  1可以是据评估报告作的原始估算费用,也可以是经亚行批准的修正估算费用。
                                               提款签字人:_______
                                               (单位公章)


第 [1] [2] [3] [4] [5] [6] [7] 页 共[8]页